Desalination


Client : Emaar Egypt – Marassi
Capacity : 2000 m
3
/day
Challenge : Increasing levels of salinity due to
contamination of feed water with
hypersaline water
Solution : Designing the operational parameters
as conservative as possible to withstand
the Increase levels of salinity compared
with the normal levels of the location.
Industrial wastewater treatment plant
consists of two spitted streams; each
consists of preliminary treatment,
equalization system, physicochemical
treatment, biological treatment, and
sludge conditioning & dewatering.

At vero eos et accusamus et iusto odio digni goikussimos ducimus qui to bonfo blanditiis praese. Ntium voluum deleniti atque.