Client | : Emaar Egypt – Marassi |
Capacity | : 2000 m 3 /day |
Challenge | : Increasing levels of salinity due to contamination of feed water with hypersaline water |
Solution | : Designing the operational parameters as conservative as possible to withstand the Increase levels of salinity compared with the normal levels of the location. Industrial wastewater treatment plant consists of two spitted streams; each consists of preliminary treatment, equalization system, physicochemical treatment, biological treatment, and sludge conditioning & dewatering. |