Type | Surface Water Treatment Plant |
Capacity | 5000 CMD |
Challenge | Lack of access to the location for heavy construction equipment |
Solution | Pre-engineered Steel Tanks transported to location via naval transportation and installed in location. |
Type | Surface Water Treatment Plant |
Capacity | 5000 CMD |
Challenge | Lack of access to the location for heavy construction equipment |
Solution | Pre-engineered Steel Tanks transported to location via naval transportation and installed in location. |