| Type | Containerized Ultrafiltration – Water Treatment Plant |
| Capacity | 5000 CMD |
| Challenge | Plant to be constructed within an existing water treatment plant. The available area was very limited and disrupting the existing plant operation wasn’t an option. |
| Solution | Pre-engineered containerized Ultrafiltration plants to be transported and installed within the location. |