Desalination

Client : Emaar Egypt – Marassi
Capacity : 2000 m 3 /day
Challenge : Increasing levels of salinity due to contamination of feed water with hypersaline water
Solution : Designing the operational parameters as conservative as possible to withstand the Increase levels of salinity compared with the normal levels of the location. Industrial wastewater treatment plant consists of two spitted streams; each consists of preliminary treatment, equalization system, physicochemical treatment, biological treatment, and sludge conditioning & dewatering.

At vero eos et accusamus et iusto odio digni goikussimos ducimus qui to bonfo blanditiis praese. Ntium voluum deleniti atque.

Melbourne, Australia
(Sat - Thursday)
(10am - 05 pm)