Desalination
Client : Emaar Egypt – Marassi Capacity : 2000 m 3 /day Challenge : Increasing levels of salinity due to contamination of feed water with hypersaline water Solution : Designing the operational parameters as conservative as possible to withstand the Increase levels of salinity compared with the normal levels of the location. Industrial wastewater treatment […]